Time needed: Approximately five minutes.
Maintenance frequency: Every six (6) months or when the coolant level is low.
Important: Use coolant only. Replace the coolant and filters every six (6) months.
Prerequisite:
- The packaging material is removed from the industrial chiller.
- The chiller is connected to the printer.
Step-by-step:
1. Open the injection port on top of the chiller to add the coolant, see the illustration below.
2. Add coolant carefully, observing the level gauge. The indicator has to remain in the
green area.