Each type of material offered by ETEC has specific instructions for use. Be sure to properly prepare your specific material before each use. Always observe the relevant Material Safety Data Sheets supplied with the material bottle. |
Important: Do not use other materials than the ones delivered by ETEC®. Use the appropriate personal protective equipment. Make sure that the extraction is sufficient. ETEC® recommends an air change of 25 m³/h per m² effective surface of the laboratory as described in EN 13779.
To add printing material to the material tray:
1. To open the hood, pull the hood lock on the rear side and then lift the hood upwards..
2. A material tag is attached to the material bottle. Remove the material tag and place the material tag on the material tag reader.
3. Shake the material bottle well. Open the material bottle and pour the material slowly into the material tray.
4. Mix the material thoroughly with a supplied material mixing card. Close the hood to protect the material from ambient light.